Entry in the small RES installations register (MIOZE)
For owners of small renewable energy installations who need an entry in the MIOZE register of small RES installation producers in order to carry on generation as a regulated business activity in Poland.
What scale does this apply to? Example: one built small RES installation with complete technical data. Corrections to the technical documentation raise the price.
Prices are net, in EUR. VAT depends on your status and place of establishment.
You can order this service directly, without a prior consultation. We confirm the scope and the fee before we start.
A consultation is optional. To discuss your matter with a lawyer first, you can book a consultation. If you then order the work, its cost is credited against the project fee.
Before we start, we agree and confirm the scope and the fee. The price is indicative and does not constitute an offer within the meaning of the Polish Civil Code.
What it includes
Verification of the technical parameters of the installation against the requirements of the MIOZE register
Preparation of the complete filing documentation, including the description of the installation and its technical data
Handling the verification and entry of the installation in the MIOZE register
Advice on the rights and obligations that follow from the status of a registered installation
What the price does not include
Technical and construction design and equipment certification (outside the scope of legal services)
Obtaining a licence for energy trading (separate scope for selected business models)
Advice on auctions and on the preferential energy price (priced separately)
What you receive
The filing submitted and conducted until the competent authority completes its verification
Documentation prepared in line with the requirements of the register
Planning an energy project or facing a regulatory matter in Poland? The energy law team of HWW Hewelt Wojnowski Lindner i Wspólnicy sp.k. handles such matters, including grid connections, land, permits, licences and proceedings before the URE. A short description of the matter is enough, and we reply by 5 pm Warsaw time on the next business day.
An entry in the MIOZE register opens the way to generating energy in a small installation as a business activity and to the preferences provided for in the Renewable Energy Sources Act. Three main stages.
Analysis and verification of the installation
We check the technical parameters and confirm that the installation meets the definition of a small RES installation and the requirements of the register.
Documentation
We prepare the description of the installation, its technical data, certificates and the other documents required by the authority keeping the register.
Filing and entry
We file the notification with the MIOZE register and monitor the verification until the proceeding is completed.
Who needs an entry in the MIOZE register
The MIOZE register is the register of producers of energy in a small renewable energy installation. Entry in the register is a condition for carrying on the business of generating energy in a small installation, because this is a regulated activity. It also matters for obtaining some of the rights and preferences provided for in the Renewable Energy Sources Act. Legal support is useful where the technical documentation or the administrative procedure presents a challenge for the investor.
What is worth knowing about the register
Entering an installation in the register requires technical and administrative criteria to be met. The installation must actually be built, it cannot merely be planned. In the filing documentation the decisive elements are the correct technical parameters, that is rated capacity, type of source and capacity of the installation, together with the data of the installation and of its owner. Errors in the filing can delay the process, which is why careful preparation of the documentation is an investment in the smooth course of the procedure.
What the fee depends on
Type and capacity of the installation (photovoltaic, wind, biomass)
Number of technical details requiring verification and correction
Location and the distribution system operator involved
We agree the fee individually, at an hourly rate or as a flat fee, and confirm it before we start.
To order this service, describe your matter. A consultation is not required. We confirm the scope and the fee before we start.
Planning an energy project or facing a regulatory matter in Poland? The energy law team of HWW Hewelt Wojnowski Lindner i Wspólnicy sp.k. handles such matters, including grid connections, land, permits, licences and proceedings before the URE. A short description of the matter is enough, and we reply by 5 pm Warsaw time on the next business day.