Skip to content
Energy & RES

Generation licence, installations 10 to 50 MW

For renewable energy investors and operators developing generation projects of 10 to 50 MW who need a generation licence from Poland's Energy Regulatory Authority (URE).

Fee
from 7 000 EUR net
Prices are net, in EUR. VAT depends on your status and place of establishment.

You can order this service directly, without a prior consultation. We confirm the scope and the fee before we start.

Request a quote Book a consultation first
A consultation is optional. To discuss your matter with a lawyer first, you can book a consultation for PLN 600 net + VAT. If you then order the work, its cost is credited against the project fee.

Before we start, we agree and confirm the scope and the fee. The price is indicative and does not constitute an offer within the meaning of the Polish Civil Code.

What it includes

  • Assessment of the regulatory regime applicable to an installation of this capacity (generation licence rather than producers register entry)
  • Collection and preparation of complete application documentation (property title, technical and financial documents)
  • Preparation and filing of the application to the President of the Energy Regulatory Authority (URE)
  • Representation throughout the URE proceeding, including correspondence and requested clarifications

What the price does not include

  • Building permits and environmental decisions (separate scope)
  • Grid connection conditions and interconnection agreements (separate service)
  • Appeals against URE decisions to the Court of Competition and Consumer Protection (SOKiK) (priced separately)

What you receive

  • A generation licence application filed and conducted through to the URE decision
  • Clarity on licence obligations and on the further requirements that apply before energy sales begin
How it works

How a generation licence is obtained

For an installation of 10 to 50 MW the licence route applies, and the work concentrates on documentation and on the proceeding itself. Four steps.

  1. Regulatory assessment

    We confirm the regime applicable to the installation and the documentation the application will require.

  2. Documentation completion

    We gather property title documentation and the technical and financial documents required for the application.

  3. URE application

    We file the application and conduct the correspondence and clarifications during the proceeding.

  4. Decision

    We conduct the matter through to the decision of the President of URE and explain the obligations arising from the Energy Law and the Renewable Energy Sources Act.

Who needs this service

The service is for investors and operators bringing a renewable generation project of 10 to 50 MW into operation, who must hold the proper regulatory basis before they begin selling energy. At this capacity the licence route applies, so the work runs from the review of the project documentation, through the application, to the decision of the President of URE.

What shapes the scope at this capacity

A project of 10 to 50 MW is priced on the assumption of one project with complete technical and legal documentation. Portfolios of several projects are quoted separately, and a complex ownership structure or gaps in the documentation increase the scope of work. The starting point is therefore a review of what the project already has, because documentation scope, timeline and cost follow from it.

What the fee depends on

  • Installation capacity and the resulting documentation requirements
  • Completeness of project documentation at project start
  • Number of installations and locations covered by the application

We agree the fee individually, at an hourly rate or as a flat fee, and confirm it before we start.

Request a quote

To order this service, describe your matter. A consultation is not required. We confirm the scope and the fee before we start.

Information you share in connection with legal assistance is covered by the professional secrecy of advocates and attorneys-at-law under Polish law.

How to start

You can order this service directly or book a consultation first. A consultation is not required to order the service.

Book a consultationContact us