Who this service is for
We advise aggregators, active customers, generators and storage facility holders.
Criteria for choosing counsel for aggregation (in Polish).
Please prepare
- The business model, the participants and the start date.
- A list of installations, capacities, metering points and operators.
- Sale, distribution and aggregation agreements, and capacity market documents.
- The DSO’s grid code or its draft, and correspondence with the operator and the President of URE with delivery dates.
Before drafting the agreement, we compare the list of installations and metering points with the technical documentation and the sale and distribution agreements.
When this service is not enough
Licences and a change of connection conditions require a separate engagement. Auctions are covered by the capacity market offer.
What the fee depends on
- The number of companies, installations and DSOs.
- The variants of agreements and cooperation.
- The documentation, the links with the capacity market.
- The stage of consultations or of proceedings concerning the penalty.
The final quotation depends on the client’s factual and legal situation; we present it once we know that situation, before work begins.
To discuss the matter with a lawyer first, you can book a consultation for PLN 600 net + VAT. If you then order the work, its cost is credited against the fee for this project.
The price is indicative and does not constitute an offer within the meaning of the Polish Civil Code.
Questions and answers
Does the holder of an energy storage facility need an aggregator?
Not always. Article 3(11k) of the Energy Law permits holders of storage facilities connected to distribution networks to provide flexibility services, with the exclusion of the coordinated 110 kV network. We check the connection point before choosing the model.
Can an aggregator operate after filing the application?
No. An aggregator may start its activity only after entry in the list (Article 5b⁴(1) of the Energy Law). The President of URE enters an aggregator within 14 days of the submission of the application (Article 5b⁴(4) of the Energy Law). The applicant supplements missing data within 7 days of delivery of the request (Article 5b⁴(9) of the Energy Law). We match the timing of the application to the readiness to start aggregation. The President of URE strikes off, ex officio, an aggregator which has not started aggregation within 6 months of entry (Article 5b⁴(7)(3) and 5b⁴(8) of the Energy Law).
Does an aggregation agreement require the supplier’s consent?
No. An aggregation agreement does not require the consent of the supplier or of a transmission or distribution undertaking (Article 5a¹(2) of the Energy Law). The aggregator must, however, inform the operator and the supplier of the conclusion of the agreement (Article 5a¹(5) of the Energy Law). For each metering point an agreement may be concluded with only one aggregator (Article 5a¹(8) of the Energy Law). Before a new agreement we check the existing agreement for that point.
Legal basis
Act of 10 April 1997, the Energy Law (Prawo energetyczne), consolidated text: Journal of Laws of 2026, items 43, 516, 607, 900, 1347 and 1348:
- Article 3(6e), (6f), (11k) and (13e); Article 11zp.
- Article 5a¹(1) to (5) and (7) to (11); Article 5b²(1) and (2).
- Article 5b⁴(1) to (4), (7)(3), (8) and (9).
- Article 9g(2), (4)(2c) and (2d), (5e), (5f), (6a) and (7a); Article 9ja(2); Article 9jd(1) and (2).
- Article 32(1)(2)(a) and (1)(4).
- Article 56(1)(19), (19a) and (19b), 56(2), 56(3)(1) and (3), and 56(3d).
Amending Act: Act of 18 September 2026 amending the Energy Law and certain other acts (Journal of Laws of 2026, item 1348):
- Article 8.
Act of 8 December 2017 on the capacity market (the Capacity Market Act), consolidated text: Journal of Laws of 2026, item 1400:
- Article 2(1)(4), (7) and (14).
What we have done in this area
In 2025, for several investors planning energy storage facilities, HWW described how the transmission system operator’s tariff settles system charges for a storage facility. It also described whether storage facilities with a storage capacity of around 1 to 2 MWh can provide system services, including emergency reduction and increase of consumption. HWW also set out the conditions under which such storage facilities can enter capacity market auctions.