Who this service is for
We assist district heating companies, industrial plants and suppliers of waste heat.
Please prepare
- A diagram of sources, the network and customers with installed and contracted capacities.
- A description of the use of heat for industrial and residential purposes.
- Financial and technical documents, documents confirming staff qualifications and the draft development plan.
- Licences, letters and dates of delivery.
When this service is not enough
Disputes about supplies and settlements require a separate engagement. See: law firm for district heating.
What the fee depends on
- The number of sources, networks and types of activity.
- The state of the documentation.
- The stage of the matter and the need for an appeal.
The final quotation depends on the client’s factual and legal situation; we present it once we know that situation, before work begins.
To discuss the matter with a lawyer first, you can book a consultation for PLN 600 net + VAT. If you then order the work, its cost is credited against the fee for this project.
The price is indicative and does not constitute an offer within the meaning of the Polish Civil Code.
Questions and answers
Does industrial heat always exclude the licence obligation?
Not automatically: the interpretation of Article 32(4) of the Energy Law is disputed. Article 32(4) reads: “Obtaining the licence referred to in paragraph 1 point 1 is not required for conducting business activity in the generation of heat obtained in industrial technological processes”. The provision adds: “as well as where the amount of capacity contracted by customers does not exceed 5 MW”. The law firm assesses the separateness of the conditions and the industrial character of the process in an installation, for example a server room.
What financial documents should be prepared?
An entity conducting business activity presents financial statements for the last 3 years (Article 35(1)(3) of the Energy Law). We verify whether the financial documents and the technical description correspond to the scope of activity indicated in the application.
What is the time limit for supplementing the application?
The time limit is at least 21 days from the delivery of the request (Article 35(2a) of the Energy Law). An application not correctly supplemented within the time limit is left without examination (Article 35(2b) of the Energy Law). The company should keep the confirmation of delivery.
Do heat pumps have a special time limit?
Yes, at most 30 days from the President of URE receiving the complete application (Article 32(1b)(3) of the Energy Law). The provision concerns the grant or amendment of a licence for generating heat with a pump with an installed electrical capacity of up to 50 MW. The company verifies the electrical capacity in the documentation.
Legal basis
- Act of 10 April 1997, the Energy Law (Prawo energetyczne), consolidated text: Journal of Laws of 2026, items 43, 516, 607, 900, 1347 and 1348.
- Article 7b(5), (6) and (7); Article 16(1); Article 30(2).
- Article 32(1)(1)(e), (1)(3), (1)(4)(a), (1b)(3), (4), (4a) and (4b).
- Article 33(1) and (3); Article 35(1), (2a), (2b) and (3).
- Article 41(1), (1a), (2) and (3); Article 47(1b), (1c) and (1d).
How to instruct us
- Please describe the matter in the form or call +48 22 100 42 24. Please state the planned date of the start of supplies or the date of delivery of the letter.
- We will reply by 17:00 on the next working day.
- Before work begins, we indicate in the quotation the scope and the fee, including whether the engagement covers the appeal, the first tariff and the reporting obligations.